09/12/2025
Mining News

Tara Resources Montenegro lead zinc mine Brskovo will not have waste tailings dam

The new Brskovo Mine uses best practice waste management approaches, and does not require a tailings dam.

Mining waste from the open-pits and processing waste from the plant will be combined and stored in dry, solid form, called an Integrated Waste Management Facility, located next to the open pits in the project area, 2.5km from the town of Mojkovac.

Avoiding a tailings facility has many advantages: it requires a smaller footprint, the facility has greater stability, and can be built and rehabilitated in stages during operations. Each stage will be covered with grasses and shrubs, giving the area a natural appearance.

Related posts

Europe’s Midstream Reckoning: Why Processing Power Will Decide the Critical Minerals Race

Nikola

RESourceEU and the Return of European Mining Power: How the EU Is Rebuilding Its Raw Materials Backbone

Nikola

The Serbia–Romania–Bulgaria Industrial Corridor: Europe’s Most Investable Midstream Hub for Processing, Engineering, and R&D

Nikola
error: Content is protected !!