Bulgaria mining: Dundee gold mine Chelopech upper areas drill plan
Dundee Precious Metals Inc. announced the results of the updated Mineral Reserve estimate for its Chelopech mine in Bulgaria, as prepared by CSA Global (UK) Pty. Ltd.
This Mineral Reserve update follows the December 21, 2015 announcement regarding the 15% increase to the Measured and Indicated Mineral Resource category of the Mineral Resource inventory at Chelopech. The Mineral Resource estimate, as reported in February 2016 (CSA, 2016), remains unchanged and has been used as a basis for Mineral Reserve estimates as outlined in this press release. This Mineral Resource estimate (“MRE”) is reported as of December 31, 2015, which reflects the mined volumes used to deplete the resource.
“This update to the Chelopech Mineral Reserve has not been impacted by the 15% increase to Mineral Resources announced in December,” said Rick Howes, President and CEO of DPM. “We are optimistic that with 28,000 metres of drilling planned for the upper areas of Chelopech in 2016, we will start to move these additional resources into the mine plan.”
Latest Posts
Popular Post
- Eldorado and Minvest Deva Certej mine proposal rejected in Romania
- What Are The Major Natural Resources Of Macedonia?
- Armenia’s environmental crimes committed in Azerbaijani lands are said to cause $285 billion in damages
- Kazakhstan to produce 21,600 mt of uranium in 2018
- Thyssenkrupp exclusive distributor of graphite production from Elcora Adv Materials
- How valuable is Kosovo’s mineral wealth?
- Aspire Mining’s future production plans
- Miedzi Copper Corporation discovers deposits of silver and copper in Poland
- Mineral Commodities announced results from Trælen Graphite Mine in Norway
- Uzbekistan completes copper mine expansion project