24 C
Belgrade
05/05/2024
Mining News

Tara Resources Montenegro lead zinc mine Brskovo will not have waste tailings dam

The new Brskovo Mine uses best practice waste management approaches, and does not require a tailings dam.

Mining waste from the open-pits and processing waste from the plant will be combined and stored in dry, solid form, called an Integrated Waste Management Facility, located next to the open pits in the project area, 2.5km from the town of Mojkovac.

Supported by

Avoiding a tailings facility has many advantages: it requires a smaller footprint, the facility has greater stability, and can be built and rehabilitated in stages during operations. Each stage will be covered with grasses and shrubs, giving the area a natural appearance.

Related posts

Dundee Precious Metals propels Čoka Rakita gold project in Serbia amid promising economic study

David Lazarevic

Continued exploration efforts: Rio Tinto and the Jadar project

David Lazarevic

Boliden to restart operations at Tara zinc mine in Ireland with workforce reduction

David Lazarevic
error: Content is protected !!